PM Surya Ghar: Muft Bijli Yojana
Rooftop solar with up to ₹78,000 back from the government
We design, install and commission your on-grid rooftop system, then handle the portal, KSEB net metering and subsidy follow-up for you.
Subsidy estimator
How much will the government pay?
- Central subsidy
- ₹78,000
- Approx. generation
- 360 units/mo
₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW, capped at ₹78,000. Generation assumes about 4 units per kW per day; actual output depends on your roof and shading.
Subsidy
How much you get back
The central subsidy is fixed by system size. Choose the size from your monthly units on the KSEB bill.
| System size | Suits monthly use of | Approx. generation | Central subsidy |
|---|---|---|---|
| 1 kW | 0 – 150 units | ~120 units/mo | ₹30,000 |
| 2 kW | 150 – 300 units | ~240 units/mo | ₹60,000 |
| 3 kW and above | above 300 units | ~360 units/mo | ₹78,000 |
The process
Six steps, and we're with you on each one
Register on the portal
Sign up at pmsuryaghar.gov.in with your KSEB consumer number and mobile number.
We help you registerKSEB feasibility
KSEB checks your connection and approves rooftop solar. Usually a few days to two weeks.
We follow upChoose Reckon as vendor
We survey your roof and confirm the design and price. You select us as your vendor on the portal.
Free site visitInstallation
Panels, inverter, mounting structure, earthing and wiring installed and commissioned by our team.
Reckon installsNet meter
We upload the commissioning documents and KSEB installs the net meter.
We file itSubsidy in your bank
The central subsidy is paid directly to your bank account, typically within one to three months of approval.
We track it
What's included
A complete system, not just panels
Panels
ALMM-listed solar modules as required by the scheme, including domestic cells for projects from June 2026.
Inverter
BIS-certified on-grid inverter with online monitoring on your phone, where the model supports it.
Structure
Galvanised mounting structure suited to concrete or sheet roofs, built for Kerala's rain and wind.
Safety
Earthing, lightning arrester, DC and AC protection boxes and proper cabling.
Paperwork
Portal registration, commissioning upload, net meter application and subsidy follow-up.
After-sales
Local service from our Kollam office and guidance on panel cleaning.
Our work
Rooftop systems we've installed




Questions
PM Surya Ghar FAQ
Who can apply for PM Surya Ghar?
Any household with a domestic electricity connection in its own name, a roof it owns or has the right to use, and no earlier central subsidy for rooftop solar. Commercial and agricultural connections are not covered.
How much subsidy will I get?
₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or more. The subsidy is paid directly into your bank account after the system is installed and the net meter is working.
Do I pay the full cost first?
Yes. You pay the system cost to the vendor, and the central subsidy is refunded to your bank account after approval. Low-interest bank loans are available under the scheme if you need them; we can guide you through the loan application.
How long does the whole process take?
Installation itself takes one or two days. With KSEB feasibility, net meter installation and subsidy approval, the full process usually takes a few weeks, and the subsidy typically arrives within one to three months.
What happens during a power cut?
A standard on-grid system switches off during a power cut for the safety of KSEB line workers. If you want backup, ask us about a hybrid inverter with a VION lithium battery.
Will I really get free electricity?
A 3 kW system produces around 300–360 units a month on a good roof in Kerala. Extra units you export are adjusted against what you use under net metering, so many homes see their bill drop to only the fixed charges.
Want a price for your house?
Send your latest KSEB bill on WhatsApp. We'll reply with the right system size and your subsidy.